Continuous Manufacturing 2.0: What’s Next for Early Adopters?

Time: 5:15 pm
day: Day One AM

Details:

• Need for development suite with all unit operations available that can be joined together in flexible and modular configurations

• Challenges in developing an automation system to suit and reflections on existing rigs

• Advantages of developing a new suite of operations which is more transferable to a CMO

Speakers: